Sunday, 4 March 2007

Weekly Progress (week beginning 26th Feb 07)

  • The work planned this week was to go out and capture the sound of the dawn chorus. I took the digital video camera and tripod as always, however this time I also took the external microphone as sound would be the main feature of this expidition.
  • Friday 2nd March 07- On this day I went out in miday and just captured more footage of any wildlife I could get. Also I climbed up two small tree's and got a shoot from a tree. I also tried to climb up a tree to get a look at inside a birds nest, however it was impossible for me as for one, it was way to high, two, the branches are to thin and weak to hold me and three, I would be having to carrying a camera and tripod, meaning I would only be ble to use one hand to move around with, which is an impossible situation Sunday 4th March 07- This morning I woke up at 5.45pm and left and 6.15pm and stayed until 7pm. Apart from being freezing cold, it was a wonderful atmosphere to capture. Also a pair of Geese were flying around and adding to the dawn chorus mix. I also took the chance to re-shoot the 360 degrees shot, low angle shot of the trees and sky.
  • Next week I intend to start my editing and first off all, as I do not have firewire port, I will have to capture all my footage, meaning that I will have to go through two full tapes and 20 mins of a third tape. After that I can take it home and start to construct it, develop a script and choose to do my voicover etc.

No comments: